Skip to content
Pre-sale and pre-demo asbestos work handled Open 24/7 (914) 454-5638
Asbestos Removal Harrison logo

For work inside the city

ACP-5 Filing for Harrison Owners With City Projects

When the renovation is inside New York City, get the survey and Asbestos Assessment Report that the permit application leans on.

Architectural drawings of a house

Why Would a Harrison Owner Need an ACP-5?

Harrison has no use for the ACP-5 on its own soil. Asbestos work up here falls under New York State rules, Industrial Code Rule 56. Still, a good number of Harrison residents own a co-op in Manhattan, manage an apartment house in the Bronx or run a contracting outfit with crews below the city line, and down there the ACP-5 matters. Within city limits, asbestos falls under a separate program run by DEP, the city's Department of Environmental Protection. Before the Department of Buildings issues most permits, an investigator certified by DEP surveys the space and signs the Asbestos Assessment Report, known as the ACP-5, confirming the planned work leaves regulated asbestos alone. Should the survey find material the work would disturb, abatement comes first, under its own notification. We take care of the survey, the report and, if it comes to it, any abatement, so your permit application never sits idle for want of one form.

What ACP-5 Work Covers

Everything leading to a filed report, plus the plan if the survey turns something up.

  • Surveying the space

    A DEP-certified investigator inspects every area the project will open.

  • Lab work when called for

    Questionable materials cut and analyzed before anyone signs.

  • A signed assessment

    The ACP-5 prepared and signed by that certified investigator.

  • Filing alongside the permit

    The report lodged so it is ready when the Buildings application moves.

  • Abatement when asbestos shows up

    Removal under a separate notification before the permitted work begins.

  • Working with your expediter

    We keep your architect or expediter in step so the forms match.

How an ACP-5 Moves

  1. Lay out the project

    Which borough, how much work, and how far the permit application has gotten.

  2. Survey plus samples

    The investigator looks over the space and samples anything doubtful.

  3. Report filed or material abated

    Nothing regulated in the way means the ACP-5 gets filed. Otherwise, abatement happens first.

Why Owners Here Use Us for City Filings

  • Survey, filing and removal under one roof

    A positive survey simply hands the abatement to the same crew, no new contractor to vet.

  • Straight talk on the boundary

    We tell you honestly whether a city filing touches your project or not.

  • Updates without chasing

    You hear where the survey, the lab and the filing stand without making calls.

  • DEP-certified investigators
  • Lab-confirmed samples
  • Report lodged for you
  • Abatement when needed

Is a Building Permit Hung Up on Asbestos Paperwork?

Say where the building is and what the renovation involves. We will lay out what the filing takes.